• +880131721637
  • sabbab@sst-tsdhel.com
Facebook
Twitter
Youtube
  • Home
  • Company
    • About
    • Leadership
    • Major Concerns
    • Human Resources
    • Research & Safety
  • Services
  • Equipments
  • Projects
    • Completed Projects
    • Ongoing Projects
  • Contact
Menu
  • Home
  • Company
    • About
    • Leadership
    • Major Concerns
    • Human Resources
    • Research & Safety
  • Services
  • Equipments
  • Projects
    • Completed Projects
    • Ongoing Projects
  • Contact

Project Status: Completed

Dredging for Changjiang Yichang Waterway Engineering Bureau (CYWEB) at Coxs Bazaar Airport

Dredging for Changjiang Yichang Waterway Engineering Bureau (CYWEB) at Coxs Bazaar Airport Project Awarded by: Changjiang Yichang Waterway Engineering Bureau (CYWEB) – China Civil Engineering Construction Corporation (CCECC)-JV      

Steelwork for roof frame including roofing over the gallery of CPA, the high-tech swimming pool

Steelwork for roof frame including roofing over the gallery of CPA, the high-tech swimming pool    

United Power Plant Development Project

Project Awarded by: United Tank Terminal Limited Location : Potenga, Chittagong

Eviction Works in Laldiar Char

Project Awarded by: Chittagong Port Authority Eviction Works in Laldiar Char      

Construction of Precast Parapet Erection & Cable Trough Cast in Situ (For Dhaka Metro)

Project Awarded by: Italian Thai Development Corporation Construction of Precast Parapet Erection & Cable Trough Cast in Situ  

Construction of Pile Cap and Pier Head in Dhaka Mass Rapid Transit Development (For Dhaka Metro)

Project Awarded by:  Italian Thai Development Corporation   Construction of Pile Cap and Pier Head Dhaka Mass Rapid Transit Project          

Dredging, Construction of dyke and Earth filling of the low land of Bay Terminal, CPA

Project Awarded by: Chittagong Dry-dock Limited & Chittagong Port Authority BEFORE: PRESENT:

6 storied Composite industrial building at Section Seven Ltd. At CEPZ

Basic Data: Structure Type: Composite, Column – RCC, Beam – Steel, Total Level: Factory – 4 ,Office – 6

Construction of Passenger Ship Landing Station with Steel Causeway and Gangway and Pontoon in Patenga Terminal

Project Awarded by: Chittagong Dry-dock Limited & Chittagong Port Authority BEFORE: PRSENT:

Construction of Passenger Ship Landing Station with Steel Causeway, Gangway and Pontoon for the purpose of Passenger Jetty at Sadarghat.

Project Awarded By:  Chittagong Dry-dock Limited & Chittagong Port Authority. BEFORE: PRESENT:    

← older

S.S. Trading started as a logistics service provider to the growing infrastructure & development sector of Bangladesh.

Facebook
Twitter
Youtube

All rights reserved © SS Trading

Company

Leadership

Services

Human Resources

Major Concerns

contact

  • +88 0131721637
  • sabbab@sst-tsdhel.com
  • sabbab@gmail.com
  • Saltgola Bandar, Chittagong

Website Designed & Developed with 💓 by SP Content